Sunday, September 05, 2004

Let The Rebuild Begin

Well we have started on the rebuild. There will be two bedrooms upstairs with a "great " room and a bath and a half. Downstairs we will have a Master Suite and an optional bedroom/nursery/office next to it. It will also have a three quarter bath in the hall. Living, dining and kitchen will all be incorporated into one large open area. Stay tuned as I will post more as we go along.

The floor truss system.(second floor) Posted by Hello

Some of the framers. Posted by Hello

A pic of the "bridge" that will connect the two parts of the second story. Posted by Hello

The first walls of the second story going up. Posted by Hello